During an internal audit, a point of non-compliance with the site procedure for the entry of equipment into the WN36 building was identified: the passage of equipment from a non-classified area to a classified area without decontamination. The conceptual and feasibility mission was entrusted to CoCEPTIO. This included the organisation of several workshops with the customer to identify the existing situation and review the programming of the zones, to co-construct a design proposal for the facilities and to analyse the implementation of the project in detail.